Concrete Specialist

Company:  Endeavour Recruitment
Location: Devonport
Closing Date: 07/11/2024
Hours: Full Time
Type: Permanent
Job Requirements / Description
Excellent long term contract opportunity for a British candidate eligible for SC Clearance to join a leading client based in Plymouth.

This is a hybrid role. Onsite every 4-6 weeks.

Role Specification

* Review the existing Technical Specification for the works and provide any feedback on Section 7 ‘Reinforced Concrete’ which you believe may need to be considered. Once reviewed, this specification sets the baseline for which the subsequent activities shall assess compliance.

* Constituent Material Qualification

* Review, comment, and accept the Contractors Proposal/Structural Concrete Constituent Material Supply Report.

* Review, comment, and accept the Contractors Proposal/Concrete Validity study on the target concrete mix design.

Sensitivity Study

* Review, comment, and accept the Contractors Proposal/Sensitivity study to evaluate the sensitivity of the concrete to accidental variations in batch masses.

* Review, comment, and accept the Contractors Proposal to undertake tests to reflect these lower tolerances where the batching tolerances for the plant are significantly lower than those indicated in BS EN 206 (if applicable).

* Review, comment, and accept the Contractors Proposal/Admixtures used in the validity study, including infrared spectrophotometry results (completed in accordance with a procedure written by the contractor and submitted for information). The analysis is to be carried out by an independent organisation.

* Review, comment, and accept the Contractors Proposal/Additional tests for qualification of a self-compacting concrete (if applicable).

Concrete Production Suitability Tests

* Final suitability testing confirms the performance of the concrete during construction operations. No concrete mix design shall be cast in place without undergoing an initial suitability test (concrete shall be produced using the proposed production plant and replicated site conditions as closely as feasible). No change shall be made to the target concrete mix design from the qualification test except for the admixture dosage.

* Precautions against thermal cracking

* Review, comment, and accept the Contractors Proposal to ensure the maximum temperature at any point in the concrete does not exceed 60ºC

* Review, comment, and accept the Contractors Proposal to ensure the maximum temperature differential between the centre of the concrete pour and the surface of the pour shall not exceed the limit set.

Review, comment, and accept the Contractors Proposal/Report that summarises:

* Anticipated temperature and strength profiles of the concrete.

* Anticipated temperature differentials of the concrete considering.

* Ambient temperatures.

* Pour thickness.

* Actions that will be taken to control peak temperatures and/or differentials.

Methodology for monitoring in-situ concrete temperatures, which as a minimum should include;

* Typical location of sensors (two sensors to be used at central locations in initial pours in case of failure).

* Automatic logging of sensor output every 30 minutes.

Production Conformity Control

* Sampled review (All records for the initial Class 1 pour, then reducing to 5% sampled check throughout the construction programme) on the conformity control submissions.

* Confirm that Lifetime Quality Records are being compiled as per the ITP / Quality Plan. Progressive checks to be completed on the records at monthly intervals.

* Review, comment, and accept the Contractors Proposal/methodology for controlling maximum temperature and restricting temperature differentials in the concrete and controlling Early Age thermal cracking in accordance with reports.

* Identifying any concrete pours at risk of excessive heat development and the measures to mitigate this.

* Review, comment and accept the Contractors Proposal/Method statement for the production, transport, placing, compaction (with particular reference to slender sections) and curing of concrete giving details of the proposed plant, equipment, methods, products and personnel.

* Review, comment and accept the Contractors Proposal/Quality Control Plan and Sampling and testing plan for the concrete from production to the completed element.

* Review, comment and accept the Contractors Proposal/Method statement for making good to defects including details of proposed materials.

* Review, comment and accept the Contractors Proposal/Datasheets provided for all admixtures proposed for use in concrete.

* Review, comment and accept the Contractors Proposal/Proposed sequence of pours indicating the position and nature of joints where appropriate.

Does the above specificaion match your experience and expectaions? We look forward to reviewing your cv?
Apply Now
An error has occurred. This application may no longer respond until reloaded. Reload 🗙